Project Description
Major Electrical Components: High Voltage (15KV/25KV), Electrical Controls, Electrical Power Circuits (All Systems in Rigid Conduit)

Description of Work: Installed (4) utility poles with S&C primary switches (15KV and 25KV) and associated overhead cabling, crossarms, pole mounted transformers, ect. Installed (2) owner-furnished 25KV substations with primary switches (1MVA/2MVA), 15KV and 25KV cabling/terminations. Installed (1) owner-furnished 15KV primary switch for owner-furnished 7000 HP motor. Installed (20) sections of owner-furnished motor control center (Ferrous/Hydraulic Area’s). Installed owner-furnished control building with motor control center (Non Ferrous Area). Installed complete lighting system in Non Ferrous Area and Picking House. Installed (3) owner-furnished high mast light poles with fixtures (approximately 110’ high). All Electrical power/controls installed in rigid conduit with Nema 4X (stainless) disconnect switches and junction boxes.


Year
2010-2011


Location
4801 Florida Ave. New Orleans, Louisiana


Project Type
Industrial


Architect
N/A


General Contractor
N/A


Value
$3,000,000.00